RIVER RIDGE GATEWAY PHASE 1A INTERCHANGE





Part of a major construction project, Louisville Paving and Construction worked to assist creating a heavy-haul road to help traffic through the River Ridge Commerce Center make it to the Port of Indiana-Jeffersonville. The River Ridge portion was constructed in three phases; the first of which the River Ridge Development Authority awarded to Louisville Paving and Construction, building the beginning 3,000 feet of this road.
Phase 1A work on this $6,075,060 project included:
- the removal of existing pavement
- construction of new roadway
- bridge
- MSE retaining wall
guardrail - storm sewer
- drainage culvert
- erosion control measures
- landscaping features
- pavement markings and signs
- common excavation
- rock excavation
- stockpiling of materials
- soil preparation
- site grading
Owner: River Ridge Development Authority & United Consulting